a task completed by 30 persons in 4 days. in how many days, the same will be completed by 40 persons?

Respuesta :

Plasmataco
Plasmataco Plasmataco
  • 25-11-2017
Basically to solve this you do:
Time1*Worker1=Time2*Worker2
Thus Time1=4, Worker1=30, Worker2=40
4*30=40*Time2
Time2=4*30/40
Time2=3 days
Answer Link

Otras preguntas

A coin is thrown at random into the rectangle below. A rectangle is about 90 percent white and 10 percent green. What is the likelihood that the coin will land
Fermentation is a complex chemical process of making wine by converting glucose C6H12O6 into ethanol C2H5OH and carbon dioxide: C6H12O6(s) ---> 2 C2H5OH (l)
What is the solution of this system of linear equations? A. (1, 0) B. (0,0) C. (0, 1) D. X=0 Graph is attached , help quick please
how would you solve this problem?
can someone help please? i’ll give brainliest
Find the product. -4x(x2+8) PLEASE HELP!!! ASAP!!!
The area that was located south of Upper Egypt was called __________. A. Nubia B. the Levant C. Lower Egypt D. the Sahara Desert
PLEASE HELP!! "After this fine last lesson I managed to make a small fire out of wet twigs, got a cup of tea, stripped off my dripping clothing, wrapped myself
The following painting depicts a scene from Pride and Prejudice. Look at the painting provided, and compare what is depicted with what you have read in the exce
Which could be used to solve this equation? 3 and one-fifth + n = 9 Subtract 3 and one-fifth from both sides of the equation. 3 and one-fifth minus 3 and one-fi