__________ have a weakness of being difficult to follow when multiple paths exist, but __________ are more helpful in the hands-on task of managing the 1project.

Respuesta :

andriansp andriansp
  • 04-11-2017
the answer to this question is Gantt charts, networks
The gnantt cahrts is one of the most common method in arranging group schedules within a certain organization.
These charts usually includes several elements such as date of the project, budget flow, and persons that are in-charge for each projects
Answer Link

Otras preguntas

if 9^x-9^x-1=24, then find the value of (6x)^x
what is the solution for this inequality -10x <40
Two of the emission wavelengths in the hydrogen emission spectrum are 410 nm and 434 nm. One of these is due to the n=6 to n=2 transition, and one is due to the
container is 5 meters wide ,6meters long and 3 meters in depth what is the capacity in quarts
The scale of a square map indicates that each inch on the map corresponds to 5 miles. Write an expression that describes the area of land shown on the map. If t
Draw 2 lines in a triangle. Make 2 triangles and 2 trapezoids.
Iliada went to Minewaska state park one day this summer. All of the people at the park were either either hiking or bike riding. There are 178 more hikers than
Why are the irish famous for drinking?
what is 0.000702 in scientific notation.
How is 'hearing' a motif in the novel A Separate Peace by John Knowles?