jordidiaz8104 jordidiaz8104
  • 23-07-2017
  • Business
contestada

âa(n) ________ starts with the assumption that current activities in a company will not automatically continue in the next period.

Respuesta :

andriansp andriansp
  • 31-07-2017
A zero based budget starts with the assumption that current activities in a company will not automatically continue in the next period.
Zero based budget is designed to justify all existing expense in order to find out the true value of a company, which means that this method will not recognize any form of earning and liabilities that haven't been actualized by the company.
Answer Link

Otras preguntas

Your new cake recipe is for an 8-inch-by-8-inch square pan. You have a round pan you can use if it has the same area as the square pan. What should be the diame
Please answer thanks
Geographers are able to pinpoint the location of a place from east to west by using? A) latitude lines B) the equator C) longitude lines D) parallel lines
What is the significant digit in 23.45
Both flat worms in round worms have a body type called?
which of the following is a area of the special trepezoid if ab=19,cd=19 and the height is 14
The mass of a gold bar changes based on its location because of gravitational pull. True or false?
A 10.0 kg crate is pushed with a horizontal force of 40 N. The crate moves at a constant velocity of 3.0 m/s. What is the value of the friction force on the cra
did the native Americans attack the Americans that were moving to the west
While reading a poem you should ?? A) explain what you have learned b) identify details and organize ideas c) Predict what you will learn