angklyl31 angklyl31
  • 24-12-2021
  • Computers and Technology
contestada

Project planning output is :

A. Top-down planning

B. Bottom up planning

C. Waterfall planning

D. Iterative planning

Respuesta :

MubeenAshraf
MubeenAshraf MubeenAshraf
  • 25-12-2021

Answer:

A

Explanation:

The main output of Project palnning is project plan.

Answer Link

Otras preguntas

can you solve this? :)
In an actual lever system similar to Figure 8, Fi × di represents _____. work output torque work input friction
In 1 or 2 sentences, define intellectual property and list the four ways that the government provides intellectual property rights.
Solve the equation 3/4x+3-2x = -1/4+1/2x+5
Which statement is false? The inequality sign always opens up to the larger number. The greater number in an inequality is always above the other number on t
I can’t figure out what this math problem
Who was elected because of his appeal to the common people?
1/3 + 1/2 = 5/6 5/6 - 4/5 = 1/30
Ava ate 5 crackers, or 5% of the entire box. How many crackers were in the box
With what limits to the west and the south Belize? A) Guatemala B) Mexico C) The Caribbean Sea D) Australia