NOTKNOWING NOTKNOWING
  • 25-10-2021
  • Mathematics
contestada

How long would it take eight lumberjacks to chop down eight trees at the same rate?

Respuesta :

Gervy
Gervy Gervy
  • 25-10-2021

Answer:

4 hours

Step-by-step explanation:

It take them 1.5 h ÷ 0.5 h to chop down 1 tree, so it would take 0.5 h × 8 = 4 hours to chop down 8 trees

Answer Link

Otras preguntas

If you could see inside an atom, how could you tell if it would have a positive charge?
find the domain of the ration function R(x)=7-2x/x^3-8x^2+7x
Co(g) effuses at a rate that is ______ times that of cl2(g) under the same conditions.
Select all that apply. Which of the following audiences would probably be uninterested in a magazine that includes Science Fiction stories and review Science F
15 minutes is the same as?
Fter patient care, where should respirators be removed? A. In the patient room B. Only in a designated respirator removal area C. In the patient room as long as
Can someone summarize this in one sentence PLZ In 1863 the state experienced a serious drought and an early frost, and Governor Brown announced to the legisla
Simplify (23)^–2. A.) -1/64 b.)1/64 c.)2 d.)64
Jordan were successful in 10 out of 15 foul shots. What percent of shots was she successfull?(round your answer to the nearest tenth)
Convert y= 2x(x-6)-5 to vertex form.