lxpoku lxpoku
  • 21-07-2021
  • Mathematics
contestada

12 workers take 4 hours to complete a job. How long would it take 15 workers to complete the job?

Respuesta :

ThatsTJ32
ThatsTJ32 ThatsTJ32
  • 21-07-2021

Answer:

3.75

Step-by-step explanation:

Answer Link

Otras preguntas

4(3x +5)>3(x+4) solve for equality
Can yall help me with this
What is the Greatest Common Factor of 8 and 76? Be sure to show your work or explain your process
After it snows it takes Maria and her little sister Anita 1/2 of an hour to shovel the snow off of the sidewalks on their street. This is 2/3 of the time it tak
physics is hardddd. please help me
A rectangular security area is enclosed on ene side by a wall, and the other sides are fenced. The length of the wall is twice the width of the area. The total
if a rock has a volume of 22.0 mL and a mass of 55 g. what is the density
A major fishing company does its fishing in a local lake. The first year of the company's operations it managed to catch 175,000 fish. Due to population decreas
Field Notes: Specimen collected from Black Hills National park (WY), found predominately at higher elevations (5,000 feet and above). Laboratory Analysis: Body
What is the "meteor of ocean air" that "shall sweep the clouds no more"? What is Holmes referring to?