In 8 days, a group of workers can plant 72 acres.
What is their rate in acres per day


Helppp fastttt

Respuesta :

loconte loconte
  • 21-06-2021

Answer:

Step-by-step explanation:

72/8 = 9 acres per day

Answer Link
Susssybaka
Susssybaka Susssybaka
  • 21-06-2021
9 x 8 = 72

So 9!




Hope this helps!
Answer Link

Otras preguntas

Who has pennfostsr answers?
Janes quiz scores: 82 64 73 91 85 what is the mean ?
write -0.14 as a fraction or mixed number in simplest form
Humans, monkeys, and apes belong to a group of animals known as
how do you simplify 681
Both the leftmost digit and the rightmost digit of a four-digit number N are equal to 1. When these digits are removed, the two-digit number thus obtained is N
a giraffe can run about 14 meters per second find its speed in miles per hour
how did congress try to settle  the slavery issue in 1850?
what does slippered pantaloons means in the seven ages of man for william shakespeare
Which of the following best describes the difference between a mixture and a pure substance?