williammolan12 williammolan12
  • 24-04-2021
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created? A. A. Subject
B. Start Date
C. Due Date
D. % Complete

Respuesta :

jonesangel08 jonesangel08
  • 25-04-2021
The answer is D complete I believe
Answer Link

Otras preguntas

how to turn 0.95 into a fraction
The Smart Blues and the Royal Reds are playing a football game. The Smart Blues' first play goes for -2 yards. How much did the Smart Blues gain or lose? A. The
Which two men led led slave revolts during the 1800s?
What factor led to Nixon’s re-election in 1972
Find the length l of one "arch" of this cycloid, that is, find the distance traveled by a small stone stuck in the tread of a tire of radius r during one revolu
charactersitics of an algebraic expression
How does Mrs. Cratchit feel about Scrooge in stave 3 of a Christmas Carol?
Brad is a 40-year-old banker. which stage of development is he in?
Please help me with this question
Which of these foods is an aperitivo? A. Torta de manzana y leche asada B. Café o té C. Sopa o ensalada D. Aceitunas y maní