jlterryjlterry4419 jlterryjlterry4419
  • 25-01-2021
  • Mathematics
contestada

A construction job for gallery 10 painters were tasked with painting the interior these painters made up 40% of the painting crew so how many painters in all worked on this job

Respuesta :

adioabiola
adioabiola adioabiola
  • 26-01-2021

Answer:

Total number of painters = 25 painters

Step-by-step explanation:

Interior painting = 10 painters

These painters made up 40% of the painting crew

how many painters in all worked on this job?

Let

Total number of painters = x

Interior painters = 40% of x

10 = 40% * x

10 = 0.4 * x

10 = 0.4x

x = 10/0.4

x = 25 painters

Total number of painters = x = 25 painters

Answer Link

Otras preguntas

What is a linear model?
f(x)=3/x+2+3 domain and range
Which of the following scenarios could be represented by the expression 6x+11y? A. The total weight of a box containing x 11-ounce packages of almonds and y 6-
You are building a house and are making a drawing of the kitchen. the sink is 3 feet away from the dishwasher, and the sink is 8 feet away from the fridge. the
What is the probability that a randomly selected contestant won a prize, given that the contestant was female write the probability as a percent please help
Need help with algebra please asap!
Identify the plural form of the word in parentheses. The (monkey) were the most popular exhibit at the zoo. monkeys monkies
QUESTION 17 ONLY. PLEASE HELP!
A helicopter flies 168 miles against the wind in 2 hours; with the wind, it can fly 252 miles in the same amount of time. find the speed of the helicopter in st
The perimeter of kite wxyz is 2, square root 53 + _____units