kaisynneal
kaisynneal kaisynneal
  • 21-10-2020
  • Computers and Technology
contestada

Which calendar view is based on a user's configuration of the five days of the week that the user works along with
work hours, configurable in the Outlook Calendar options?
Day
Schedule View
Week
Work Week

Respuesta :

richlynr richlynr
  • 26-10-2020

Answer: Work Week

Explanation:

i just did the review

Answer Link
125616 125616
  • 12-11-2020

Answer:   D) Work Week

Answer Link

Otras preguntas

Which term is used to describe a tactic available to senators who wish to block the passage of a bill?
What features could be improved or added to make a battery powered clock more reliable?
how many 4 digit passcodes are possible if no digits are repeated
what does glycolysis require
what was the last things that went throuth the mind of the 9/11 jumpers?
What is 20 over 45 in its simplest form?
Objective and subjective tests, which include written and research papers, are called: A. test types. B. assessments. C. exams. D. qualifiers.
In this sentence, what part of speech is the word in bold? The OPENING notes of the song caught my ear. Verb Noun Adjective Adverb I thought it might be adjecti
which is the best description of the change the east slave trade after the 1500's
Help? What is the scale factor?