The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as

Respuesta :

topeadeniran2 topeadeniran2
  • 26-08-2020

Answer: template method

Explanation:

The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as template method.

It should be noted that estimating time and cost are vital because it helps schedule work, develop needs of cash flow and show progress of a project.

Answer Link

Otras preguntas

here is a scale of a fountain at a museum. the scale is 1:30. how many boulders are in the real fountain​
Africa suffers from AIDS, What are 2 possible solutions to this?
A group of 12 male and 8 female students is talking about going out for pizza. If 50% of the male students actually go and 25% of the female students actually g
What role does Coffein play in our life?
A 50 litre solution of acid and water contains 10 litres of acid. How much water must be added to make the solution 8 % acidic. Will mark brainest to whoever an
You can probably find algae that conduct photosynthesis in polar regions or hot springs on your dinner plate all of the above
the chloride of a metal M contains 47.25% of metal 1.0 gram of metal would be displaced from a compound by 0.88 gram of another metal N . find the equivalent we
what is 4+2+-8+-6? ​
why did the British preserve official documents​
7. Where do the animals talk and behave like human beings?​