It took $4$ days for $75$ workers, all working together at the same rate, to build an embankment. If only $50$ workers had been available, how many total days would it have taken to build the embankment?

Respuesta :

pointlessstuff06
pointlessstuff06 pointlessstuff06
  • 25-06-2020

Answer:

2.67 days

Step-by-step explanation:

75/4=18.75

18.75/50=2.67

Answer Link

Otras preguntas

which property is (3+5) times 6 = 3 + (5 times 6)
Which answer is closest to the true value of the expression: (9.1 x 10⁴)(1.1 x10^{-5})(log10^{-13})(1000) (a) 1.3  (b) 13000  (c) -13000  (d) 1.3 x 10^{-11} Can
state the degree and leading coefficient of each polynomial in one variable. If it is not a polynomial in one variable, explain why. Need help 1. −6x^6−4x^5+
What is 3,649x7 in distributive property form?
What is an ion? in chemistry
Write 314,207 in expanded form
Which of the following is a sign of inflammation? a. bruising b. swelling c. numbness d. temperature decrease
write the equation a. a vertical line that passes through the point (2,-6)b. the y axis c.  a horizontal line that passes through the point (1,4)d. the x axis
write 6/10 as a terminating decimal
what decimal is equivalent to 122/11?