tomgikaria tomgikaria
  • 21-04-2020
  • Physics
contestada

A crane lifts a 400 N crate full of baked beans 15 m. How much work was done by the crane?

Respuesta :

muhammadtalhabinyous
muhammadtalhabinyous muhammadtalhabinyous
  • 21-04-2020

Answer:

6000 J

Explanation:

work = F x S

work = 400 x 15

work = 6000 J

Answer Link

Otras preguntas

Describing Periods on the Periodic Table Which statement accurately compares the trends in atomic number and atomic mass in the periodic table? The atomic numbe
Select all the correct answers. An organization wants to improve its network Security to limit access to confidential Information on its internal network. The o
What is the probability of the spinner landing on 1 or 3
Pleaseeeeeeee helpppppp meeeeeeeeeeeeeeee
word problem note : solve this with languagewhat is the perfect square which has 19 as one of the two equal factor​
Which of the following best describes what would have to change to transform an oligarchy into an autocracy? A. An elite group would have to take control of the
During its 2019 fiscal year, a city receives a grant from the state to use on a worthy city project as determined by the city council. No other eligibility requ
The tile along the edge of a triangular community pool needs to be replaced. A right triangles, where the hypotenuse is labeled 8 x squared, the height is label
What is the measure of each angle of a regular 24-gon? If necessary, round to the nearest tenth.
A 3-year-old boy presents with multiple-system trauma. The child was an unrestrained passenger in a high-speed motor vehicle crash. On primary assessment, he is