30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

Why it is not possible to draw a square that is not a parallelogram
1. Explain the different forms of child abuse? Include Shaken Baby Syndrome in your response.
Which one of the following statements expresses a true proportion? A. 2 : 3 = 3 : 2 B. 3 : 5 = 12 : 20 C. 42 : 7 = 6 : 2 D. 14 : 6 = 28 : 18
Whose image will replace Andrew Jackson on the U.S. 20$ bill
if an element has more than one ionic change how is that piece of information represented in the chemical name
The inferior hypogastric plexus is the site of synapse between sympathetic preganglionic and postganglionic neurons for: a. Part of the foregut b. All of the fo
When parietal cells secrete protons into the stomach, what would you predict would happen to the pH of the blood? Would this process be affected if you treated
How can global warming lead to changes to the Earth’s surface? a. Global warming can lead to an increased number of earthquakes, which change the Earth’s surfac
What did Anti-Federalists fear would happen if the Constitution became law?
who is the first presiden of United States?