30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

kandelhira20
kandelhira20 kandelhira20
  • 23-02-2020

Answer:

it is from unitary method

men days

30 40

25 let(x)

now from indirect variation

25×x = 30×40

25x= 1200

x=1200÷25

x=48

so there were 48men to complete the work

Answer Link

Otras preguntas

When using ________ financing, the company incurs a legal obligation to repay the amount borrowed?
There are four statues by michelangelo in the great grotto. what were they originally designed for?
Hurrryyyy!!! True or false. In a process called plucking the rocks dragged by glaciers produce grooves and scratches on bedrock.
You have a recipe that calls for 3 eggs for every 2 cups of flour. You use 12 eggs. How much flour do you need?
Which statement is FALSE about Machu Picchu? Select one: a. It is the spiritual center of the Incan Empire. b. It is a UNESCO World Heritage Site. c. It is loca
What happened to the population as a result of Dust Bowl migrants?
Which of the following is equivalent to the expression (3ab)(-5ab)?
How does the body store bile without a gallbladder?
Simplify 12(A - B). A. 12AB B.12A - B C.12A - 12B
1. If you roll a fair six-sided die, what is the probability of rolling a 4? a. 0 b. 1/6 c. 1/3 d. 1/2 e. 1 2. Which of the following represents the sample spa