Program Evaluation Review Technique (PERT) is a _____ technique because it analyzes a large, complex project as a series of individual tasks.

Respuesta :

ngumahsix ngumahsix
  • 23-01-2020

Answer:

scheduling technique

Explanation:

Project Evaluation Review Technique and Critical Path

Method (CPM) are scheduling techniques used to plan, schedule,

budget and control the many activities associated with projects.

Projects are usually very large, complex, custom products that

consist of many interrelated activities to be performed either

concurrently or sequentially.

Answer Link

Otras preguntas

How did the light dress up for the costume party
An extended __________ is a comparison that says one thing is another for several lines, for a stanza, or throughout a poem. simile metaphor symbol theme
which is part of ethnic nationalism and separatism?
which one of the following items its example of software
In the chart below shade each day that Ned will swim,circle each day Ned will bicycle
Which of the following sentences has the most sophisticated word choice? The bride’s tearful face emerged from a cascade of lace. The bride, dressed in whi
During his trip to the United States, Alexis de Tocqueville observed that Americans
Based upon the pH scale, a vegetable with a pH of 5.3 would be A. ionic. B. neutral. C. acidic. D. basic.
is 120% less than greater than or equal to 3.45
What political reforms resulted from the French Revolution?