prabhatimsina prabhatimsina
  • 21-11-2019
  • Mathematics
contestada

If it takes a person to dig a garden in 6 days and another person 2 days how many days would it take for them to finish together

Respuesta :

5156323
5156323 5156323
  • 21-11-2019

Answer:

4 Days

Step-by-step explanation:

Because, The 6 day person would slow down the 2 day person to 4 days :)

Answer Link

Otras preguntas

who is the president
Since the mid 1970s, the united states has _____. been the largest exporter of clothing in the world had a significant trade deficit had a significant trade sur
Luigi is an urban planner. as an independent contractor, he charges $140 fee plus $ 25 per hour for each contract with the city. Write a function to represent
What verb tense does recover convey
Without representatives in Parliament how did the Americans force the British to repel many of the new acts? Were they successful? Answer in a paragraph.
Write the expressions as a difference and simplify it: 17x−13y+8 and 20x+6y.
Which statement is the strongest claim for an argumentative research paper? A. Many residents have noticed that the store along silver lake is riddled with litt
Which equation correctly applies the distributive property A. −2.5⋅(4⋅1.045)=(−2.5⋅4)⋅1.045 B. 50+1.015=(50⋅1)+(50⋅0.01)+(50⋅0.005) C. (0.5⋅0.5)+(0.5⋅0.3
A characteristic of most “fad” diets include: inclusion of all food groups, utilizing a healthy eating plan inclusion of physical activity use of “magic” or
Name each polygon! Determine if it appears to be a regular or not regular