A machinist can produce 12 parts in 40 min.how many parts can the machinist produce in 4 hours?

Respuesta :

CoolGuyJ CoolGuyJ
  • 23-10-2019
Answer:

72 parts

Steps:

Convert the 4 hours into minutes. There are 60 minutes in an hour. Therefore, 4 hours = 240 minutes.

Divide 240 minutes by 40 minutes. This equals 6. Therefore, the machinist can produce the 12 parts 6 times in 4 hours.

Finally, multiply the 12 parts by the 6 times he can produce. Therefore, the machinist can produce 72 parts in 4 hours.
Answer Link
breeee05
breeee05 breeee05
  • 23-10-2019
1.2 Parts In 4 Hours .
Answer Link

Otras preguntas

In a right angled triangle, the acute angles are in the ratio 4:5. Find the angles of the triangle in degree and radian....​
Write an essay about health is wealthat least 300 words​
8,300 divided by 10 over 3
“Combined” represents what operation? a. addition b. multiplication c. subtraction
What type of law lays out the specifics, definitions, and penalties for crimes in Wisconsin?
1) Give an equation for the line which goes through (1,-5) and has slope m=-3.
If there is a solution I must put it down please help.
Describe a place or a situation in which you could find water as a solid, a liquid, and a gas all at the same time.
mention 5 problems of science and technology ​
Give one additional example of nationalism throughout history (don’t use unification of Germany as your example)