The concept of a communications management plan makes logical sense, yet many projects do not create or follow this type of plan. Why do you think this is the case?

Respuesta :

Cetacea
Cetacea Cetacea
  • 23-10-2019

Explanation:

Even though communication plan is based on sense of logic , still it is not used in many projects because cycle of project take place in numerous months and the change management task's path is difficult and time taking for that.

Learning new processing task and then adapting it is also a negative factor for using communication management plan. The features of the communication plan does not let it get indulged in the projects.

   

Answer Link

Otras preguntas

what was a characteristic of the rulers of the Zhou dynastythey created a strong central governmentthey use harsh treatment to control the peoplethey believe th
27=p(1+r3) solve for r
If (5^4)^M = 5^12, what is the value of m? 2 3 5 8
create a truth table for The Logical statement​
What is the length of Side B C given that Side C G is 2.5 inches and Side G B is 2.5 StartRoot 3 EndRoot inches? Round to the nearest tenth. A cube. The top fac
What is the product 3/8. (-3/6)
Based on 2018 data, the probability that a randomly chosen woman over 64 years of age is divorced is about 0.14. This probability is a long-run proportion based
Use dimensional analysis to convert the quantity to the indicated units. 27 ft to in in. (Round to the nearest hundredth as needed.)
21 15 X = ? A. 6 units B. 3V74 units C. 3V35 units D. 616 units
Please help I will mark brainliest