tacolover7456 tacolover7456
  • 21-08-2018
  • Business
contestada

Cost center responsibility reports typically focus on the flexible budget variance.
a. True
b. False

Respuesta :

andriansp andriansp
  • 30-08-2018

That statement is true

Budget variance refers to the difference between the expected amount of the budget with the actual amount of the budget. The difference in budget variance tend to be influenced mostly by the number of externalities that arise during operation (such as natural disaster or accidents)

Answer Link

Otras preguntas

Dans 2 minutes, il fera 1/6 du triple de la moitié de la journée.
Two blocks with masses 1 and 2 are connected by a massless string that passes over a massless pulley as shown. 1 has a mass of 2.25 kg and is on an incline of 1
pormal na sanaysay tungkol sa cyber bullying​
vbfggvfgvffgvbfgfggtfgtgtffggfgf
help pleaseeeeeeeeeeeee
the distribution of lengths of rainbow trout from a certain river are normally distributed with a standard deviation of 2.4 inches. it 15% of the rainbow trout
The Truman Doctrine called for democratic nations to?
6 coins are tossed five times. Show how you would compute the probability that same faces on 6 coins appear 3 times and the probability that different faces on
What occurs in the light-independent reaction of photosynthesis?
write a dairy entry as if you are one of the courtiers including your first reaction upon seeing the looms and your plan for how you would report back to the em