johnka37 johnka37
  • 24-05-2018
  • Mathematics
contestada

If a job can be completed in 4 hr, then the rate of work is __ of the job per hour.

Respuesta :

hhong2021 hhong2021
  • 24-05-2018
1 divided by 4 is 0.25 or 1/4
Answer Link
mmpeachey107
mmpeachey107 mmpeachey107
  • 24-05-2018
To find the rate of work, split up the hour by 4. So, 1 divided by 4.  This makes .25 (also written as 1/4).  So the rate of work is 1/4 of the job per hour.

Hope this helps! Can I have Brainliest? :)

Answer Link

Otras preguntas

a book has a mass of 5 lb what is the mass of the book kg
twice a number plus four is equal to seven less than the number
Which characteristic of Islamic art is a direct result of the Muslim belief that only Allah can create living forms?
Explain how in glycolysis that the splitting of one glucose molecule results in 4 ATP but there is only a net gain of 2 ATP.
can an object have zero acceleration and nonzero velocity?
an antelope can run at a speed of 42 miles per hour.How many feet per second is tgis?
Does a waist-to-hip ratio show extra weight on up your hips
From 2004 to 2014, the amount of money invested in renewable energy worldwide increased from $39.5 billion to $214.4 billion. What was the percent increase of m
To solve for m in the formula , use the multiplication property of equality. 1)True or 2) False?
symbolism in The Washwoman