nnjjjkkkjnj7874 nnjjjkkkjnj7874
  • 22-05-2018
  • Business
contestada

If a project has a positive net present value the expected rate of return for the project is

Respuesta :

MrsTriplet MrsTriplet
  • 31-05-2018
If a project has a positive net present value the expected rate of return for the project is greater than one. NPV stands for net present value PV. NPV is a formula used to find revenue minus cost within a firm. Using the net present value firms can figure out the value of revenues and how their cash flow is doing. 
Answer Link

Otras preguntas

Which of these elements is a noble gas? A. hydrogen (H) B. barium (Ba) C. nitrogen (N) D. krypton (Kr) E. bromine (Br)
true or false need help
which of the following correctly relates the measures of the measures of the measures of the diameter (d) and radius (r) of a circle A) d=r/2 B) r=2d C) r=d/2 D
What is the process by which a gas becomes a solid without becoming a liquid first?
Jamie has to enter the names, grades, and scores of a group of students into a worksheet. Which option will Jamie use to describe the data? A.labels B.graphs C.
A linear function has the same y-intercept as x + 4y = 12 and its graph contains the point (9,5). Find the slope of the linear function.a. 2/9b. 9c. -2/9d. 5/9
which best describes the function containing the point in the table
The picture below shows the graph of which inequality
which is a characteristics of nuclear fission
The perimeter of triangle RXA is 24. If RX = 4 and RA = 11, find XP and PA.