byronzv1102 byronzv1102
  • 26-01-2024
  • Mathematics
contestada

Si una casa tarda en construirse 15 días trabajando 8 obreros. ¿Cuántos días tardará si se contratan 4 obreros adicionales?

Respuesta :

Otras preguntas

(20 points, please help!) Which name is a correct way to name the tiling? Thank you very much.
Groups that seek to advance a particular set of interests are called
Union for latino and filipino farmworkers
Compare 1 out of 3 and 3 out of 10. Are these values equal?
what are the necessities of sexual reproduction​
What is a word-for-word excerpt from a text, framed by quotation marks?
Assume that word is a variable of type String that has been assigned a value. Assume furthermore that this value always contains the letters "dr" followed by at
Due to demand, Donovan dairy plans to double its size in 4 years and will need $250,000 to begin development. If they invest $175,000 in an account that pays 8.
Solve for y. 3.2 = 2y. please answer thanks :)
I have 3 flower vases. My daughters sent me flowers. The packet of cut flower food that came with the flowers says to add 1/2 gallon of cool water. I want to fi