bunnycx8982 bunnycx8982
  • 25-01-2024
  • Engineering
contestada

If the NPV of drilling a well is $10MM. The dry hole cost is $3MM, and the chance of success is 75%. what is the EMV?
A) $7.5MM
B) $10MM
C) $12.5MM
D) $15MM

Respuesta :

Otras preguntas

What are the 5 steps of the Lytic Cycle?
Find the value of m​
What is the length of BC in the right triangle below?
What is the value of C in this formula?
What was the occupation of juror #3, the angry man who held out until the end? (12 Angry Men)A. Navy SealB. BakerC. messenger service owner
PLEASE HELP ME FAST!! Determine each number by writing a proportion. Round to the nearest tenth if necessary. What is 10% of 120?
I need help please !!!
I need help If one edge of a triangle is 80 degrees and another is 50 degrees at what degree is the 3rd edge
a/5 divided by 3a/10 if a doesnt = 0
What are the causes of world war 2