Hector8256 Hector8256
  • 21-11-2022
  • Business
contestada

assume that painting an office building normally takes 10 days to complete and requires two workers, each earning $50/day. however, adding another worker can reduce the painting time to 8 days. what is the expedite cost per day for crashing the painting activity

Respuesta :

Otras preguntas

A given rectangle has an area of 20 square feet. What is the length for various widths?
What is the density of Neon at room temperature?
Write an expression that shows how to use the halving and doubling strategy to find 28x50
what is a strategy for 336 divided by 8
What is a value or values that make an equation true
What is 84.7 divided by 7
What is 84.7 divided by 7
The ratio of red tulips to all tulips in Briana's garden is 1 to 3. Is it reasonable to think that the total number of tulips in the garden is 40?explain.
What is four to the eighth power over four to the fifth power
A box contains red and blue chips. There are 2 more blue chips than red chips. If the number of red chips is tripled and the number of blue chips is double, the