barloase6669 barloase6669
  • 25-10-2022
  • Business
contestada

a project leader has realized that two activities in the project cannot be done at the same time because not enough resources are available. activity 3 is critical and has a duration of 5 days. activity 4 has 2 days of slack and a duration of 2 days. how will the project leader decide which activity should be scheduled first?

Respuesta :

Otras preguntas

Discuss two reasons why the middle kingdom period was a "golden age" for egypt
a rectangular field has a perimeter of 500m and an area of 14400m2.  Find the lengths of the sides
for each pair, determine quotient is the same or different explain. A. 72,000 divide 9 and 40,000 divide 5 B. 3,600 divide 12 and 1,800 divide 6 EXPLAIN PLEASE
How do you estimate 403,446 +396,755
the law of {blank} of matter states that matter can neither be created nor destroyed
Write 1.2% in a fraction or mixed number in simplest form
the heights, x cm, of the 10 girls in an athletics team are such that sum of x (∈x) =1550 and ∈x∧2= 241250a- find the mean and varianceb- one girl, who is 173cm
what is 0.003 is one tenth of?
What is 75% of 18 I'm really confused on this lesson
what  effect did the crusades have on European civilization??